Lifecycle Value

Baseline vs. CoolCrete Renew — capital deferral & lifecycle NPV

Transparent, editable model comparing the do-nothing / conventional rehab baseline with a CoolCrete Renew scenario. Every line item and formula is visible.

Illustrative demonstration data — not an actual customer property, quote or verified ROI result.
Inputs
Baseline schedule
CoolCrete Renew schedule
Conservative scenario
-$289,632
Net Lifecycle Value (Customer)
Gross benefit
$239,938
Total cost
$529,570
Benefit-Cost Ratio
0.45×
Simple payback
17.6 yrs
Base scenario
-$22,937
Net Lifecycle Value (Customer)
Gross benefit
$448,883
Total cost
$471,820
Benefit-Cost Ratio
0.95×
Simple payback
9.2 yrs
Upside scenario
$269,780
Net Lifecycle Value (Customer)
Gross benefit
$703,099
Total cost
$433,320
Benefit-Cost Ratio
1.62×
Simple payback
6.9 yrs
Base scenario — line-by-lineGrade C
Component
Source
Present value
Deferred capital expenditure
modeled
$264,409
Avoided maintenance
modeled
$176,919
Avoided recoating
modeled
$0
Energy savings
benchmark
$0
Avoided downtime
modeled
$7,555
Residual value
modeled
$0
Gross Lifecycle Benefit (Customer)
$448,883
CoolCrete Renew total cost
-$471,820
Net Lifecycle Value
-$22,937
HeatROI AI provides screening, modeling and decision-support estimates based on user inputs, field observations, benchmark data and available test results. It does not provide structural engineering, waterproofing, code-compliance or concrete-repair design services. CoolCrete Renew is not a substitute for correcting active structural distress, reinforcement corrosion, moisture intrusion or substrate failure. Financial, energy, maintenance and service-life results are estimates and are not guarantees. Actual performance depends on substrate condition, preparation, application, exposure, maintenance and other site-specific factors.