Lifecycle Value
Baseline vs. CoolCrete Renew — capital deferral & lifecycle NPV
Transparent, editable model comparing the do-nothing / conventional rehab baseline with a CoolCrete Renew scenario. Every line item and formula is visible.
Illustrative demonstration data — not an actual customer property, quote or verified ROI result.
Inputs
Baseline schedule
CoolCrete Renew schedule
Conservative scenario
-$289,632
Net Lifecycle Value (Customer)
- Gross benefit
- $239,938
- Total cost
- $529,570
- Benefit-Cost Ratio
- 0.45×
- Simple payback
- 17.6 yrs
Base scenario
-$22,937
Net Lifecycle Value (Customer)
- Gross benefit
- $448,883
- Total cost
- $471,820
- Benefit-Cost Ratio
- 0.95×
- Simple payback
- 9.2 yrs
Upside scenario
$269,780
Net Lifecycle Value (Customer)
- Gross benefit
- $703,099
- Total cost
- $433,320
- Benefit-Cost Ratio
- 1.62×
- Simple payback
- 6.9 yrs
Base scenario — line-by-lineGrade C
Component
Source
Present value
Deferred capital expenditure
modeled
$264,409
Avoided maintenance
modeled
$176,919
Avoided recoating
modeled
$0
Energy savings
benchmark
$0
Avoided downtime
modeled
$7,555
Residual value
modeled
$0
Gross Lifecycle Benefit (Customer)
$448,883
CoolCrete Renew total cost
-$471,820
Net Lifecycle Value
-$22,937
HeatROI AI provides screening, modeling and decision-support estimates based on user inputs, field observations, benchmark data and available test results. It does not provide structural engineering, waterproofing, code-compliance or concrete-repair design services. CoolCrete Renew is not a substitute for correcting active structural distress, reinforcement corrosion, moisture intrusion or substrate failure. Financial, energy, maintenance and service-life results are estimates and are not guarantees. Actual performance depends on substrate condition, preparation, application, exposure, maintenance and other site-specific factors.